5,500 gpd, primary effluent disposal

An occupied Cape Cod apartment complex with four aging leach beds was in partial failure and had tight site access. In Fall 2023, a Perc-Rite® Drip Dispersal system was designed and installed to replace 50% of the failed capacity with minimal disruption. By late Fall 2024, the remaining original beds had failed; in Spring 2025, additional drip zones were added and tied into the existing pumps and controls. The project showcases how Perc-Rite® enables phased construction, reuse of existing infrastructure, and reliable repairs on constrained, fully occupied sites.

Structured version

Challenge:
A Cape Cod apartment complex with four separate beds experienced partial system failure. Access was constrained and the property was fully occupied, limiting excavation options and downtime.

Solution (Phase 1 – Fall 2023):
Design and install a Perc-Rite® Drip Dispersal system to replace 50% of the failed capacity, maintaining service while minimizing disturbance.

Condition Change (Late Fall 2024):
The remaining original beds progressed to failure.

Solution (Phase 2 – Spring 2025):
Install additional Perc-Rite® drip zones and integrate them with the existing pumps and controls, preserving prior investments and shortening installation time.

Result:
A compliant, scalable wastewater solution delivered in phases—demonstrating how Perc-Rite® provides flexibility for both new construction and repairs on tight-access, fully occupied sites.

BJC

BJC Digital Marketing is a full-service digital agency that supports website, email marketing and reviews growth via a range of platforms.

https://www.bjcbranding.com
Previous
Previous

Point Sebago Resort, Casco, ME

Next
Next

Cheney Road Association, Greensboro, VT